39, Chavchavadze Ave.
Tbilisi 0162, Georgia
Tel / Fax: +995 32 22-07-92


Email: info@hem.ge

Joint Stock Company HYDROENERGOMONTAJI


HEM has performed construction and installation works at the following power generating units:

Enguri HPP
Tbilisi TPP
Jinvali HPP
Khrami HPP
Vartsikhe HPP
Lajanuri HPP
Gumati HPP
Shaori HPP
Chitakhevi HPP
Ortachala HPP
Sioni HPP
Sukhumi HPP
Bjuja HPP

At the mentioned sites HEM has executed construction and installation of open switch-yard, steel constructions, high-voltage distribution lines (6 - 500kv), electric installation works for service facilities.

All substations from 6 to 110kv all erected and installed by HEM at the mentioned power stations.

Electric distribution lines with following length are constructed and installed by HEM in Georgia:

1) 0.4kv - 490km
2)6 - 10kv - 550km
3)35kv - 480km
4)110kv - 650km
5)220kv - 200km
6)330kv - 120km
7)500kv - 30km

Power transformers, from 6 to 10 kv were erected on 460 construction sites.

35kv substations were erected on 50 sites.

110kv substations were erected on 70 sites .

HEM was also participating in construction of 900 and 1400mm water distribution line on Enguri HPP and Gardabani Tpp

In the recent years HEM is executing erection and installation works for Ortachala HPP and Telasi construction sites.

Starting Month Year

Ending Month Year


Contract Name


Role

September 2007

ongoing

Erection and Installation of Dali-Kodori power supply 10kv distribution network.
A 9685m long 10kv power distribution network. Client: JSC SAKHYDROENERGOMSHENI


Sub-
Contractor



January 2008



March 2008


Rehabilitation of Khutaisi – Sukhumi (30-32km) D=530mm Main Gas Pipeline.
Bypass piping section placed underground at 1,5m from the surface.
Client: JSC SAKHYDROENERGOMSHENI

 



Sub-
Contractor


January 2008


ongoing

Electrical – installation works for Administrative building of the Ministry of Justice of Georgia. Client: JSC SAKHYDROENERGOMSHENI


Sub-
Contractor


January 2008



ongoing


Manufacturing and Installation of steel covering panels for the invert in the galleries 5 and 9, at Horizon 6, Enguri Arch Dam Foundation.
Client: JSC SAKHYDROENERGOMSHENI


Sub-
Contractor